Performance evaluation of a 12.8-MW single-flash design geothermal power plant in Northern Nevada is conducted using actual plant operating data, and potential improvement sites are identified. The unused geothermal brine reinjected back to the ground is determined to represent about 50 percent of the energy and 40 percent of the exergy available in the reservoir. The first and second-law efficiencies of the plant are determined to be 6 percent and 22 percent, respectively. Optimizing the existing single-flash system is shown to increase the net power output by up to 4 percent. Some well-known geothermal power generation technologies including double-flash, binary, and combined flash/binary designs as alternative to the existing system are evaluated and their optimum operating conditions are determined. It is found that a double-flash design, a binary design, and a combined flash/binary design can increase the net power output by up to 31 percent, 35 percent, and 54 percent, respectively, at optimum operating conditions. An economic comparison of these designs appears to favor the combined flash/binary design, followed by the double-flash design.
Skip Nav Destination
Article navigation
December 1999
Technical Papers
Retrofitting a Geothermal Power Plant to Optimize Performance: A Case Study
M. Kanog˘lu,
M. Kanog˘lu
Department of Mechanical Engineering, Celal Bayar University, 45140 Muradiye, Manisa, Turkey
Search for other works by this author on:
Y. A. C¸engel
Y. A. C¸engel
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
Search for other works by this author on:
M. Kanog˘lu
Department of Mechanical Engineering, Celal Bayar University, 45140 Muradiye, Manisa, Turkey
Y. A. C¸engel
Department of Mechanical Engineering/312, University of Nevada, Reno, Reno, NV 89557
J. Energy Resour. Technol. Dec 1999, 121(4): 295-301 (7 pages)
Published Online: December 1, 1999
Article history
Received:
November 23, 1998
Revised:
July 2, 1999
Online:
November 6, 2007
Citation
Kanog˘lu, M., and C¸engel, Y. A. (December 1, 1999). "Retrofitting a Geothermal Power Plant to Optimize Performance: A Case Study." ASME. J. Energy Resour. Technol. December 1999; 121(4): 295–301. https://doi.org/10.1115/1.2795996
Download citation file:
Get Email Alerts
Numerical Study of Composite Percussive Drilling With Consideration of Heat Transfer Between Drilling Fluid and Bottom-Hole Rock in Geothermal Drilling
J. Energy Resour. Technol (June 2023)
An Investigation of the Impact of Combustion Chamber Geometry on Turbulent Burning Speeds in a Thermodynamic Model
J. Energy Resour. Technol (June 2023)
Synergy in Syngas Yield From Co-Pyrolysis of Cow and Chicken Manures
J. Energy Resour. Technol (June 2023)
Related Articles
Performance Analysis and Optimization of Double-Flash Geothermal Power Plants
J. Energy Resour. Technol (June,2007)
Exergetic Performance Investigation of Varying Flashing From Single to Quadruple for Geothermal Power Plants
J. Energy Resour. Technol (December,2019)
Incorporating a District Heating/Cooling System Into an Existing Geothermal Power Plant
J. Energy Resour. Technol (June,1998)
Thermo-Mechanical Exergy Analysis of Balcova Geothermal District Heating System in Izmir, Turkey
J. Energy Resour. Technol (December,2004)
Related Proceedings Papers
Related Chapters
Characterizing the Resource
Geothermal Heat Pump and Heat Engine Systems: Theory and Practice
Piping and Pumping Systems
Geothermal Heat Pump and Heat Engine Systems: Theory and Practice
Organic Rankine Cycle (Binary) Geothermal Power Plants
Geothermal Heat Pump and Heat Engine Systems: Theory and Practice