During the last few years many utilities have been purchasing fossil fueled power plants designed to be used for initial or future cycling service. As more large nuclear units are placed in service with their low incremental operating cost, it is anticipated that many fossil units will be operated to meet daily cycling load demands while still retaining the ability to efficiently supply a large amount of the system base load, if it is required. This paper discusses the operation and control of a gas and oil fired variable pressure drum boiler specified and designed for peaking operation at a major U. S. utility company. Operating results obtained during normal unit shutdowns, startups for morning peak load, and rapid, variable, and constant pressure load changes are presented. Also discussed are the major control system features employed for variable pressure operation as well as operation of the superheater by-pass system. The advantages of variable pressure operation are pointed out and explained along with supporting operational data.
Skip Nav Destination
Article navigation
July 1975
This article was originally published in
Journal of Engineering for Power
Research Papers
Variable Pressure Peaking Boiler, Operation, Testing, and Control
E. G. Lansing
E. G. Lansing
The Babcock & Wilcox Co., Barberton, Ohio
Search for other works by this author on:
E. G. Lansing
The Babcock & Wilcox Co., Barberton, Ohio
J. Eng. Power. Jul 1975, 97(3): 435-440 (6 pages)
Published Online: July 1, 1975
Article history
Received:
July 30, 1974
Online:
July 14, 2010
Citation
Lansing, E. G. (July 1, 1975). "Variable Pressure Peaking Boiler, Operation, Testing, and Control." ASME. J. Eng. Power. July 1975; 97(3): 435–440. https://doi.org/10.1115/1.3446027
Download citation file:
11
Views
Get Email Alerts
Cited By
Foreign Object Damage of Environmental Barrier Coatings Subjected to CMAS Attack
J. Eng. Gas Turbines Power
Generative deep learning on images of thermo-mechanical simulation results
J. Eng. Gas Turbines Power
Related Articles
Research and Application of Risk Assessment Methodology for Power Station Boiler Superheaters
J. Pressure Vessel Technol (August,2011)
Life Assessment of Superheater/Reheater Tubes in Fossil Boilers
J. Pressure Vessel Technol (February,1994)
An Optimal Multivariable Controller With Application to Steam Temperature Control in a Boiler
J. Dyn. Sys., Meas., Control (December,1992)
Quick-Starting of Large High-Pressure High-Temperature Boilers
Trans. ASME (November,1953)
Related Proceedings Papers
Related Chapters
Scope
Consensus on Operating Practices for the Sampling and Monitoring of Feedwater and Boiler Water Chemistry in Modern Industrial Boilers (CRTD-81)
Piping Design
Power Boilers: A Guide to the Section I of the ASME Boiler and Pressure Vessel Code, Second Edition
Scope of Section I, Organization, and Service Limits
Power Boilers: A Guide to the Section I of the ASME Boiler and Pressure Vessel Code, Second Edition