In this paper, the robust H-infinity () control problem for a premium pricing process is investigated with parameters uncertainty. A previous model is modified by taking into account a predefined risky investment strategy. A robust control problem for the reserve process is proposed using linear matrix inequality (LMI) criteria. Attention is focused on the design of a state feedback controller such that the resulting closed-loop system is robustly stochastically stable with disturbance attenuation level . Finally, a numerical example with colorful figures and tables based on the data from the Shanghai Stock Exchange market is provided illustrating clearly the impact of risky investment in the system. The MATLAB LMI Control toolbox is used for the numerical calculations.
Skip Nav Destination
Article navigation
June 2015
Research Papers
Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy
Athanasios A. Pantelous,
Athanasios A. Pantelous
1
Department of Mathematical Sciences,
Institute for Financial and Actuarial Mathematics (IFAM)
;Institute for Risk and Uncertainty, University of Liverpool
, Peach Street, Liverpool L697ZL
, UK
e-mail: A.Pantelous@liverpool.ac.uk1Corresponding author.
Search for other works by this author on:
Lin Yang
Lin Yang
Department of Mathematical Sciences,
Institute for Financial and Actuarial Mathematics (IFAM), University of Liverpool
, Peach Street, Liverpool L697ZL
, UK
Search for other works by this author on:
Athanasios A. Pantelous
Department of Mathematical Sciences,
Institute for Financial and Actuarial Mathematics (IFAM)
;Institute for Risk and Uncertainty, University of Liverpool
, Peach Street, Liverpool L697ZL
, UK
e-mail: A.Pantelous@liverpool.ac.uk
Lin Yang
Department of Mathematical Sciences,
Institute for Financial and Actuarial Mathematics (IFAM), University of Liverpool
, Peach Street, Liverpool L697ZL
, UK
1Corresponding author.
Manuscript received September 19, 2014; final manuscript received February 3, 2015; published online April 20, 2015. Assoc. Editor: James Lambert.
ASME J. Risk Uncertainty Part B. Jun 2015, 1(2): 021006 (8 pages)
Published Online: April 20, 2015
Article history
Received:
September 19, 2014
Revision Received:
February 3, 2015
Accepted:
February 5, 2015
Online:
April 20, 2015
Citation
Pantelous, A. A., and Yang, L. (April 20, 2015). "Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy." ASME. ASME J. Risk Uncertainty Part B. June 2015; 1(2): 021006. https://doi.org/10.1115/1.4029758
Download citation file:
Get Email Alerts
Cited By
A Framework for In-Service Life Extension of Hydroelectric Generation Assets
ASME J. Risk Uncertainty Part B
The Study of Artificial Intelligent in Risk-Based Inspection Assessment and Screening: A Study Case of Inline Inspection
ASME J. Risk Uncertainty Part B (March 2023)
A Set of Estimation and Decision Preference Experiments for Exploring Risk Assessment Biases in Engineering Students
ASME J. Risk Uncertainty Part B
Related Articles
Synchronizing Tracking Control for Flexible Joint Robots via Estimated State Feedback
J. Dyn. Sys., Meas., Control (March,2004)
Receding Horizon Control for Constrained Markovian Jump Linear Systems With Bounded Disturbance
J. Dyn. Sys., Meas., Control (January,2011)
H ∞ Control for Continuous-Time Switched Linear Systems
J. Dyn. Sys., Meas., Control (July,2010)
An Anti-Windup Design for Linear System With Asymptotic Tracking Subjected to Actuator Saturation
J. Dyn. Sys., Meas., Control (June,2000)
Articles from Part A: Civil Engineering
Risk Assessment for Stream Modification Projects in Urban Settings
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering (June,2015)
Market Insurance and Self-Insurance through Retrofit: Analysis of Hurricane Risk in North Carolina
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering (March,2017)
Uncertainty and Legal Foreseeability in Flood Risk Management
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering (September,2020)
Climate Impact Risks and Climate Adaptation Engineering for Built Infrastructure
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering (March,2015)
Related Proceedings Papers
Related Chapters
Introduction
Managing Risks in Design & Construction Projects
Identification and Analysis of Risk
Managing Risks in Design & Construction Projects
Integrated Risk Management a New Approach to Link Different Aspects of Risk (PSAM-0126)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)